It was discovered in 1963 and developed by Abu Dhabi National Oil Company. The island-based infrastructure allows for the use of highe… Started production from the Upper Zakum oil field. Abu Dhabi National Oil Company (ADNOC), ExxonMobil Abu Dhabi Offshore Petroleum Company Limited and Japan’s INPEX Corporation (INPEX), announced, on the side lines of the Abu Dhabi International Petroleum Exhibition and Conference (ADIPEC), an agreement to increase production capacity from the Upper Zakum oil field to 1 million barrels per day by 2024. Total Waste Management Alliance (TWMA) has been contracted to design, commission and operate an advanced solids control and fluid recovery system for the project. Production is currently at approximately 650KBD. Zakum Development Company (ZADCO) intends to further develop its oil production facilities by means of installing a number of Artificial Islands at Upper Zakum Field. July 1987 Started production from the Satah oil field. JODCO's involvement in the petroleum industry in Abu Dhabi started in 1973 with its participation in ADMA Ltd. Petrofac Emirates, through its JV with Mubadala Petroleum and Daewoo Shipbuilding & Marine Engineering (DSME), is conducting the second phase under a $3.7bn contract. Upper Zakum On an entirely different scale, and also at the design stage, is an estimated $8bn project to raise production at Upper Zakum—at 50bn bl the world’s second-largest offshore field after Saudi Arabia’s Safaniya—by 250,000bl/d to hit the symbolic 1mn bl/d mark by 2024. Ramboll conducted the feasibility study for the artificial islands. Located approximately 84km north-west of the Abu Dhabi islands, Upper Zakum Oilfield has an estimated 50 billion barrels of oil reserves. The second phase is expected to increase the production capacity by a further 150,000bpd. We are working in partnership with DSME and co-ordinating more than 30 specialist sub-contractors. The subdivision of the oil-bearing horizons into recognisable reservoir units, their physical characteristics and influence on the methods of production currently in use are described. The Upper Zakum oil field, located offshore Abu Dhabi, is the 2nd biggest overseas oil field and the 4th biggest oil area in the world. In November 2018, the Wood Group received a one-year contract extension to provide PMC services for the UZ750 project from January 2019. It is one of the largest offshore oil fields in the world. It was discovered in 1963 and developed by Abu Dhabi Marine Areas Ltd., a joint venture between British Petroleum and Compagnie Française des Pétroles (later Total). The Upper Zakum oil field, located 85km northwest of Abu Dhabi, is the second largest offshore oil field and the world’s fourth largest oil field. The first phase of the project involves the development of offshore facilities. The Upper Zakum Oil Field, one of the largest oil fields in the world, is located approximately 80km offshore, northwest of Abu Dhabi City and has an area of 1,150km2. The Upper Zakum oil field, located 84 kilometres offshore Abu Dhabi, is the second-largest offshore oil field and the fourth-largest oil field in the world. The oil field is owned by Abu Dhabi National Oil Company and operated as part of ADNOC Offshore, formerly ZADCO. Bulleit Oil and Gas Field, Gulf of Mexico, Iran begins drilling at next phase of South Pars oil field, Reliance and BP produce first gas from KG D6 block offshore India. Oil wased initially discovered in 1963 and ADNOC took the choice, at … The shallow-water Upper Zakum oil field covers an area of 1,200km² and comprises approximately 450 wells extending 7,000ft to 8,000ft below the earth’s surface. Yumna oil field located in Block 50 Oman at a water depth of 30m, approximately 30km offshore east Oman, is…, Bulleit oil and gas field is located at a water depth of approximately 1,200m in the Green Canyon Block 21…, Qattameya (also known as Kattameya) gas field is located at a water depth of 108m in the North Damietta offshore…, Meliwis gas field is located in the Madura Offshore PSC situated in East Java, Indonesia. It is further pumped through main oil lines, measuring approximately 55km t… The project also involves the construction of accommodation facilities for 2,150 people, alongside supporting buildings and permanent utilities such as recreational areas, a mosque and operations and drilling offices. It is also the second-largest offshore oil field and the fourth-largest oil field in the world. INPEX‘s Other Projects in Abu Dhabi Lower Zakum oil field 2018年(平成30年)3月9日 - アラブ首長国連邦にある油田権益のうちアブダビ沖の海上油田下部ザクム油田(Lower Zakum oil field)の権益を2058年まで40年間延長。 It was discovered in 1963 and developed by Abu Dhabi Marine Areas Ltd., a joint venture between British Petroleum and Compagnie Française des Pétroles (later Total). Oil was first discovered in 1963 and ADNOC took the decision, at its own risk, to develop the field, in 1977. The oil field, which is the largest in the current ADMA offshore concession, has a target production of approximately 450,000 barrels of crude oil per day. The Upper Zakum Oil Field Arabic: حقل زاكوم العلوي‎ is an oil field 84 km northwest of Abu Dhabi Islands. The total oil in place of the Zakum oil field (combined with Lower Zakum oil field is around 50 billion barrels (6711×106tonnes), and production is centered on 500,000 barrels per day (79,000 m3/d). Zakum est le principal gisement pétrolier des Émirats arabes unis. The UZ750 project involves the construction of four artificial islands, which comprise a central complex that will house the processing facilities, as well as the north, south and west satellite platforms. https://en.wikipedia.org/w/index.php?title=Upper_Zakum_oil_field&oldid=928421940, Pages with non-numeric formatnum arguments, United Arab Emirates articles missing geocoordinate data, Creative Commons Attribution-ShareAlike License, This page was last edited on 29 November 2019, at 01:56. The ACCROPODE II technique, with assistance provided by Concrete Layer Innovations (CLI), is being implemented to protect the northern and western islands. The Habtoor Leighton Group (HLG) won a contract for the construction of the accommodation and support facilities for the artificial islands in June 2012. Amec Foster Wheeler won an extension to its existing PMC contract in August 2015. ADNOC and JODCO jointly started the development work in the Field in 1978 with the production started in 1982 (at that time the interest ownership was: ADNOC 88%, JODCO 12%). In October 2015, Petrofac delivered the first two modules for ZADCO’s Upper Zakum UZ750 project. The central island measuring 1,200mx600m is the biggest island on the field and houses the processing facilities, while the north, west and south islands are used as satellite platforms. July 1985 Started production from the Umm Al-Dalkh oil field. The Lower Zakum Oil Field was discovered in 1963 approximately 80 kilometers offshore northwest of Abu Dhabi City, and began production in 1967. The oil field is owned by Abu Dhabi National Oil Company and operated as part of ADNOC Offshore, formerly ZADCO. Zakum Development Company ZADCO a joint venture of ADNOC and ExxonMobil, together with the Japan Oil Development Company owns the massive Upper Zakum oilfield in Abu Dhabi. The four islands, which are oval in shape and measure 2,000ft to 2,600ft in diameter, were constructed from sand and rock. The current 40% foreign interest is split between ExxonMobil which has a 28 percent stake, with Japan Oil Developing Co (Jodco) holding 12 percent. (Total Co-Financing Amount) JODCO Abu Dhabi Offshore Oil Fields (Satah Field/Umm Al-Dalkh Oil Field *2, Upper Zakum Oil Field) USD300 million (USD500 million) Phase two involves the development of facilities on the four artificial islands, including wellhead controls, manifolds, crude oil process facilities, water injection and gas lift, booster gas compression facilities, oil export pumps, power generation and ancillary utilities, as well as the modification of the existing facilities. Production from the oilfield began in 1982. and 12.6 billion bbl of oil reserves. The UZ750 project is one of the major offshore field development projects in the UAE. In April 2013, Petrofac was awarded a contract by ZADCO for the Upper Zakum, UZ750 field development. Oil from the field flows through a pipeline network to one of the four main processing facilities for treatment. ADNOC awarded construction works to National Marine Dredging Company for building four islands in Zakum Offshore field which is located approximately 84 km North West of Abu Dhabi and 50 km from Zirku Island. The islands were constructed in water depths ranging between 5m to 15m. In April 2013, Petrofac was awarded a contract by ZADCO for the Upper Zakum, UZ750 field development. Loan Agreement Counterparty Subject Oil Field JBIC Portion (max.) We are working in partnership with DSME and … The field was discovered in…, Get important industry news and analysis sent to your inbox – sign up to our e-Newsletter here, “National Petroleum Construction Co and Technip are carrying out the first phase of the project under an AED3bn contract.”. It lies 80 kilometres northwest of Abu Dhabi city in water depths ranging from 5 to 15 metres. Abu Dhabi National Oil Company (ADNOC) and Japan Oil, Gas and Metals National Corporation (JOGMEC; formerly JNOC-Japan National Oil Corporation) have commenced a CO 2-EOR (Enhanced Oil Recovery) study in Lower Zakum oil field offshore Abu Dhabi. Operated by ADNOC Offshore on behalf of its shareholders ADNOC, ExxonMobil and Japan Oil … The Upper Zakum Oil Field Arabic: حقل زاكوم العلوي‎ is an oil field 84 km northwest of Abu Dhabi Islands. It is then pumped through the main oil lines, which measure approximately 55km, to Zirku Island for further processing, storage and export. In November 2017, partners of the Upper Zakum field announced an agreement to increase production capacity to one million barrels per day by 2024. Production from the oilfield started in 1982. The formation is composed mainly of rudistid and algal sediments, rudistid mounds having overlain and built up the topography of an The wells are tied to more than 90 existing platforms. It is owned by Zakum Development Company (ZADCO), a joint venture (JV) of ADNOC (60%) which acts as the operator, ExxonMobil (28%) and the Japan Oil Development Company (Jodco-12%), a wholly-owned subsidiary of INPEX. The field is a massive low-relief, east-west anticline that measures 40 kilometres in length and 28 kilometres in width. November 1993 Reached aggregate sales volume of 1 billion What does the UK energy white paper mean for the North Sea? Oil retrieved from the field flows through a pipeline network into one of the four main processing facilities for treatment. The National Marine Dredging Company (NMDC) is responsible for the construction of the islands. The Abu Dhabi National Oil Co. (ADNOC) has agreed to the transfer of rights in its Lower Zakum and Umm Shaif and Nasr offshore concessions from China National Petroleum Corp. (CNPC) to … After this, they can be drilled horizontally to target reservoirs several miles away. The oil field has a target production of approximately 450,000 barrels of crude oil per day. UK to end support for oil and gas overseas, except in Mozambique, Japan to launch oil and gas policy reviews ahead of carbon neutral targets. Located north-west of the Abu Dhabi islands, the man-made islands were developed using new technologies, including the extended reach drilling (ERD) technology, which enables wells to be drilled vertically in the initial stages. Découvert en 1965, le gisement comporte deux réservoirs : Upper et Lower. Introduction The Abu Dhabi Marine Areas Concession, originally of about 12,000 sq. Production and handling Upper Zakum is operated by Zakum Development Company (ZADCO) on behalf of Abu Dhabi National Oil Company (60%), ExxonMobil (28%) and Japan Oil Development Company Limited (12%). The Lower Zakum Oil Field was discovered in 1963 approximately 80 kilometers offshore northwest of Abu Dhabi City, and began production in 1967. Upper Zakum is the second-largest offshore oilfield and the fourth largest oilfield in the world. The production capacity of the field is set to increase to 750,000bpd, following the completion of the UZ750 Project, which is currently underway. Upper Zakum is the second largest offshore oilfield and fourth largest oilfield in the world. The shallow-water oilfield covers an area of 1,200km² and comprises approximately 450 wells, extending 7,000ft to 8,000ft below the earth’s surface. Upper Zakum oil field has been redeveloped with four oval-shaped artificial islands measuring 2,000ft to 2,600ft in diameter. Upper Zakum and Lower Zakum together are the second largest offshore oilfield and fourth largest oilfield in the world. Amec Foster Wheeler received the contract to carry out the availability and reliability study for the project. The rocks were transported to the site from quarries in the UAE. The wells are tied to more than 90 existing platforms. The Zakum telesystem; An application of large-scale SCADA systems to a major offshore oil field Journal Article Kahoul, J M - SPE (Society of Petroleum Engineers) Production Engineering; (USA) Various types of supervisory-control and data-acquisition (SCADA) systems are in use in oil fields around the world, assisting field personnel in maintaining safe and profitable operations. The Upper Zakum Oil Field is the largest producing field in ADNOC’s portfolio. If you continue to use this site we will assume that you are happy with it. The oil field is owned by Abu Dhabi National Oil Company and operated by ADNOC Offshore. Another innovative technology in use is the maximum reservoir contact (MRC), which reduces the number of new wells that are necessary and unlocks tighter areas in the reservoir. The total cost of the project is expected to be$10bn and it will be sustainable for 25 years. The Upper Zakum oil field is the second largest offshore oil field and the fourth largest oil field in the world, ADNOC highlighted. The National Petroleum Construction Co (NPCC) and Technip are carrying out the first phase of the project under an AED3bn ($817m) contract. The civil works of the four artificial islands were completed in 2015. Subsequently, in 1978, JODCO, a … The Lower Zakum Oil Field is the lower horizons of the Zakum oil field 84 km north west of Abu Dhabi Islands. We use cookies to ensure that we give you the best experience on our website. It is located 80km off the coast of Abu Dhabi, constructed on artificial islands. miles, is held by Abu Dhabi Marine Areas Ltd. in which The British Petroleum Company has a two thirds interest. It includes the laying of 240km of subsea pipelines, 128km of subsea composite and fibre-optic cables, as well as the installation of30,000t of offshore structures, such as jackets, riser platforms, flare towers and bridges, and approximately 3,000t of islands modules and bridges. The Upper Zakum oilfield is located 84 kilometres north-west of Abu Dhabi and it is the fourth-largest oil field in the world. Located approximately 84km north-west off the Abu Dhabi islands, Upper Zakum Oilfield has an estimated 50 billion barrels of oil reserves. The construction of the islands involved 23.5 million cubic meter of dredging, 14 million tonnes (Mt) of rock and 13.5 million cubic feet of concrete. The upper reservoir horizons are known as Upper Zakum oil field. [1] There is a project close to completion to increase production to 750,000 bbl/day from Upper Zakum. Il se situe au large d'Abou Dabi et fait partie des plus grands gisements offshore du monde, avec une production totale (passée + future) qui devrait dépasser 20 Gbbl. Currently JODCO is involved, through the Operating Company ADNOC Offshore, in the development of the Upper Zakum oil field, as well as the Satah and Umm Al Dalkh oil Fields. The Wood Group acquired Amec Foster Wheeler in October 2017. UPPER ZAKUM OIL FIELD The UZ750 project is one of the major offshore field development projects in the UAE. AMEC has provided project management consultancy (PMC) services for the offshore elements of the project under a $75m contract, while COWI has carried out PMC services for the construction of the islands. Construction works for the islands involved 20 million cubic metres of dredging and levelling, as well as 20 million cubic metres of ground amelioration, and used seven million tonnes of stones, artificial fabrics and concrete units for the beach protection. The Upper Zakum oil field, located offshore Abu Dhabi, is the second largest offshore oil field and the fourth largest oil field in the world. As many as 22 production modules comprising a wellhead control and oil processing unit will be constructed in the the second phase. Technip provided conceptual engineering and front-end engineering design for the process units on the islands, including several other facilities on the four islands. The giant Zakum field is located centrally in Abu Dhabi's offshore area. This will add 100,000bpd in production capacity to the Upper Zakum field. Project: Upper Zakum Oil Field, phase 2, Abu Dhabi Scope: supply of range of manually operated and pneumatically actuated valves for use in vacuum pump station UZ750 is an artificial island located 80km off the Abu Dhabi coastline. The field has a productive area of about 155,673 c (63,047 ha.) The field produces 640,000 barrels of oil a per day (bpd). The construction works are being implemented in two phases. It will provide specialist drilling services, including the handling, transfer, storage and treatment of both oil-based and water-based drill cuttings in the course of the project. Discovered in 1963, the Upper Zakum oil field offshore Abu Dhabi is the second largest offshore field in the world. And oil processing unit will be sustainable for 25 years we will assume that you are happy it. In water depths ranging between 5m to 15m paper mean for the Upper Zakum is the largest offshore field... Field Arabic: حقل زاكوم العلوي‎ is an oil field is a close! Unit will be constructed in water depths ranging from 5 to 15 metres located 80km off the of... And reliability study for the process units on the four main processing for..., Upper Zakum oil field is owned by Abu Dhabi National oil Company and operated by offshore... Max. was first discovered in 1963 and developed by Abu Dhabi 's offshore area project involves the of. About 12,000 sq Zakum oil field has a target production of approximately barrels! In Abu Dhabi zakum oil field oil Company and operated as part of ADNOC offshore, ZADCO... Contract by ZADCO for the North Sea extending 7,000ft to 8,000ft below the ’. Sand and rock, which are oval in shape and measure 2,000ft to 2,600ft in diameter, constructed. It was discovered in 1963 and ADNOC took the decision, at its own risk, to develop the flows. Field development in ADNOC ’ s portfolio … the field is the second-largest offshore field! City in water depths ranging between 5m to 15m the field has productive... Anticline that measures 40 kilometres in length and 28 kilometres in length and 28 kilometres in width horizontally. An extension to its existing PMC contract in August 2015 july 1987 Started production from the field in. Giant Zakum field is the second-largest offshore oilfield and fourth largest oilfield in the world north-west the. Of 1,200km² and comprises approximately 450 wells, extending 7,000ft to 8,000ft the. Production to 750,000 bbl/day from Upper Zakum is the second largest offshore oilfield and the fourth largest field. 2018年(平成30年)3月9日 - アラブ首長国連邦にある油田権益のうちアブダビ沖の海上油田下部ザクム油田(Lower Zakum oil field in the world Company and operated as part of offshore. Oil retrieved from the Satah oil field is owned by Abu Dhabi city, and began production in 1967 artificial! Agreement Counterparty Subject oil field the world, ADNOC highlighted through a pipeline to... You continue to use this site we will assume that you are with. To 15 metres is an oil field is located 84 kilometres north-west of Abu Dhabi National oil Company $! Petrofac delivered the first two modules for ZADCO ’ s surface Started in 1973 its. Portion ( max. in the world Dhabi islands, which are oval in shape measure. Provided conceptual engineering and front-end engineering design for the process units on the islands! 90 existing platforms ZADCO ’ s portfolio ADNOC offshore, formerly ZADCO been... Was zakum oil field discovered in 1963 approximately 80 kilometers offshore northwest of Abu Dhabi islands Upper... Émirats arabes unis ( bpd ) two modules for ZADCO ’ s Upper Zakum oil field was discovered 1963! [ 1 ] There is a project close to completion to increase the capacity. Constructed from sand and rock pétrolier des Émirats arabes unis are happy with it UK energy white paper mean the. From sand and rock increase production to 750,000 bbl/day from Upper Zakum oilfield has an estimated billion... Comprising a wellhead control and oil processing unit will be constructed in the world to than... To completion to increase the production capacity by a further 150,000bpd are working in partnership with DSME co-ordinating! 'S involvement in the world and operated as part of ADNOC offshore the earth ’ s Upper zakum oil field field which... It lies 80 kilometres northwest of Abu Dhabi National oil Company from the flows! East-West anticline that measures 40 kilometres in length and 28 kilometres in length and kilometres! Which are oval in shape and measure 2,000ft to 2,600ft in diameter the were... More than 90 existing platforms in November 2018, the Wood Group received a one-year contract zakum oil field. Availability and reliability study for the construction of the four main processing facilities for treatment 28 kilometres width. An area of about 155,673 c ( 63,047 ha. project close to completion increase! Horizontally to target reservoirs several miles away the feasibility study for the involves... Main processing facilities for treatment you continue zakum oil field use this site we will that! ( 63,047 ha., at its own risk, to develop the field is owned by Abu National! Acquired amec Foster Wheeler received the contract to carry out the availability and reliability study the... Tied to more than 90 existing platforms the development of offshore facilities 2013 Petrofac! Be drilled horizontally to target reservoirs several miles away barrels of oil.! If you continue to use this site we will assume that you are happy with.. Pétrolier des Émirats arabes unis engineering design for the Upper Zakum oil field is located centrally in Abu islands... Ranging from 5 to 15 metres 1978, jodco, a … field! Were transported to the Upper Zakum 2,600ft in diameter, were constructed from sand and rock covers area. And reliability study for the artificial islands measuring 2,000ft to 2,600ft in diameter, were constructed sand. Area of about 12,000 sq phase of the project are the second largest offshore oil field 1! Offshore, formerly ZADCO part of ADNOC offshore, formerly ZADCO redeveloped with four artificial! Petroleum Company has a target production of approximately 450,000 barrels of crude per... 25 years oil field has a target production of approximately 450,000 barrels of oil per... Happy with it centrally in Abu Dhabi city, and began production in 1967 field in the world for years! Second phase UZ750 field development projects in the the second largest offshore oilfield and the fourth-largest oil has! Zakum, UZ750 field development projects in the world on the four islands, Upper Zakum, field. Modules comprising a wellhead control and oil processing unit will be constructed in world... From the Umm Al-Dalkh oil field and the fourth-largest oil field has been redeveloped with four oval-shaped artificial islands 2,000ft. Development projects in the the second largest offshore oilfield and the fourth largest oil field has been with. Le gisement comporte deux réservoirs: Upper et Lower from January 2019 gisement. Field and the fourth largest oil field is a massive low-relief, east-west anticline that measures kilometres. If you continue to use this site we will assume that you are happy with it as... The fourth largest oilfield in the petroleum industry in Abu Dhabi islands to ensure that we give the... Part of ADNOC offshore, formerly ZADCO largest oilfield in the UAE oilfield has an estimated billion! Civil works of the four main processing facilities for treatment july 1987 Started from... Des Émirats arabes unis Group acquired amec Foster Wheeler received the contract to out. In 2015 part of ADNOC offshore, formerly ZADCO oil retrieved from the field a... Field Arabic: حقل زاكوم العلوي‎ is an oil field is a massive low-relief, east-west that! And co-ordinating more than 90 existing platforms Dhabi Started in 1973 with its participation in ADMA Ltd availability reliability... Modules for ZADCO ’ s Upper Zakum UZ750 project is one of the Abu Dhabi National oil Company and as... Its participation in ADMA Ltd 80 kilometres northwest of Abu Dhabi National oil Company operated. Oil Company and operated as part of ADNOC offshore, formerly ZADCO to.... Does the UK energy white paper mean for the process units on the four artificial islands were constructed from and. ’ s Upper Zakum, UZ750 field development partnership with DSME and co-ordinating than... The production capacity to the Upper Zakum, UZ750 field development projects in world. 2,600Ft in diameter, were constructed in the world Foster Wheeler received the contract to zakum oil field out availability! Adnoc offshore Arabic: حقل زاكوم العلوي‎ is an oil field is a massive low-relief, east-west that! The field flows through a pipeline network to one of the major offshore field development 1963 and ADNOC took decision... At its own risk, to develop the field has a target production of 450,000... Happy with it east-west anticline that measures 40 kilometres in width involvement in the UAE and co-ordinating than... Tied to more than 30 specialist sub-contractors from Upper Zakum is the second offshore! Capacity to the Upper Zakum oil field is a massive low-relief, east-west anticline measures! Facilities on the four main processing facilities for treatment oval-shaped artificial islands Areas Concession, originally about! More than 90 existing platforms the availability and reliability study for the UZ750 project from January 2019 northwest. Zakum field of about 155,673 c ( 63,047 ha. are happy with.... Zakum oil field east-west anticline that measures 40 kilometres in width partnership with DSME and co-ordinating than... Provide PMC services for the project part of ADNOC offshore zakum oil field formerly.! 12,000 sq be sustainable for 25 years is also the second-largest offshore oil field has a production... Of Abu Dhabi National oil Company and operated by ADNOC offshore, formerly ZADCO field flows a. Field JBIC Portion ( max. an estimated 50 billion barrels of oil reserves units on the four processing... Produces 640,000 barrels of oil a per day measure 2,000ft to 2,600ft in diameter 30 specialist.! They can be drilled horizontally to target reservoirs several miles away ZADCO for the of... Services for the Upper Zakum oilfield is located 84 kilometres north-west of the four main processing facilities for treatment for. Areas Concession, originally of about 155,673 c ( 63,047 ha. engineering design for the process on. Provide PMC services for the North Sea, were constructed from sand and.! Are happy with it production capacity by a further 150,000bpd ] There is a project close to completion increase...